FlareBuster® - Overview - White Paper
FlareBuster® - Modular 500 BPD Gas To Liquids (GTL) Plant
Emerging Fuels Technology (EFT) has developed a new approach to gas to liquids targeted at methane mitigation or flaring worldwide. The design, covered by several new patents, results in a significant reduction in capex per barrel of daily capacity. The first fully costed version of this design makes 500 BPD of products (85% diesel/ 15% naphtha) from 5 to 5.5 million SCFD of gas (depends on btu content). The plant consists of several already available pre-packaged systems together with several proprietary modules. Recent firm pricing from a qualified EPC for the shop-built modules as well as estimated cost of installation for the entire system in a gulf coast location indicate this plant and can be built and installed (US gulf coast) for under $30 million or $60,000 per barrel of daily capacity.
Summary of features:
- Plot area required – approximately 150 ft x 300 ft (tank storage not included)
- Generates its own power (It does not require an outside power source for startup or operation)
- ... Fill Out Form to View White Paper and Read More